Resource calculator

Endfield Resource Calculator

Turn target items into a clear materials plan. The resource calculator traces recipes through every intermediate ingredient, then separates raw inputs from craftable production steps.

Loading resource calculator...

Resource workflow

Use it as a materials checklist with context

Many Endfield items hide several layers of ingredients. This page keeps the dependency chain visible while still giving you a practical list of inputs to gather, craft, or stockpile.

Materials-first checklist

Use the table view to see what to collect or produce before starting a larger factory run.

Intermediate visibility

The planner does not stop at final inputs. It expands sub-recipes so hidden dependencies are visible.

Raw material assumptions

Forced raw materials and manual raw toggles help separate gathered items from crafted ingredients.

Fast target comparison

Change output rates or add multiple targets to compare how material pressure shifts.

Raw material baseline

Materials currently treated as base inputs

These items are always treated as raw by the current calculation data. Craftable items can also be marked raw inside the table when you want the plan to start from your existing inventory.

Originium OreOriginium Ore
Amethyst OreAmethyst Ore
Ferrium OreFerrium Ore
Cuprium OreCuprium Ore
Clean WaterClean Water
Precipitation AcidPrecipitation Acid

When to use it

Common resource planning moments

  • Preparing a shopping list before a long crafting session.
  • Checking which base ingredient is causing a shortage.
  • Comparing two upgrade paths that share intermediate materials.
  • Treating stocked ingredients as raw to see the remaining work.

FAQ

Resource planning questions

Are raw materials always gathered items?

Some raw materials are forced because the current data has no recipe for them. You can also manually mark a craftable item as raw when you already have enough stock.

Why does the resource view still show facilities?

The same engine powers both calculators. Facility information remains useful when a material checklist becomes a production plan.

Can I calculate multiple final items together?

Yes. Add more than one target and the planner combines shared ingredients into a single dependency plan.

Want to turn resources into a full factory line?

Open the factory calculator to include facility utilization and power requirements.